Paper presentated at the ” 1966 Annual Convention of the American Congress on surveying and mapping”
Washington, D.C., March 1966 by MARIANO CUNIETTI
Istituto di Geodesia, Topografia e Fotogrammetria Politecnico di Milano, Italy SUMMARY
The writer deals with a leveling operation carried out from unstable sighting station. He describes the test of a 230 fi. dia telescopic gasometer at Edison-Gas works at Milano-Bovisa, Italy. Said test was made possible only by use of an automatic level (Filotecnica Salmoiraghi 5173).
The writer is a Professor of ‘Teoria e Pratica delle Misure” at the "Istituto di Geodesia, Topografia e Fotogrammetria del Politecnico di Milano”, which was in charge of the test.
The 4.6 million cu.ft. gasometer of the Edison-Gas works at Bovisa, Milan, is of the telescopic type, four sections, hydraulic controlled with « Dempster » helicoidal guide system. The gasometer consists (sée figures 1 and 2) of a 230 ft. dia fixed section and 4 sections. They freely lift and fit one into the other according to the gas pressure and are only guided by 45° inclined rails located on the outside wall. Contrary to the gasometers of the conventional type, no outside metal structure guides the moving sections; therefore particular care had to be taken in checking the structure and the smoothness of movements. The gasometer size was an innovation for structure of the kind in 1958 and the first in Italy; this led the Company to perform special and careful checks of the movements, thus eliminating the possibility of too large, and perhaps dangerous, anomalies.
Besides other numerous types of mechanical and geometric tests, the « Istituto di Geodesia, Topografia e Fotogrammetria del Politecnico di Milano » was requested to make leveling of the different positions of the moving sections corresponding to different filling stages. The different positions were obtained by independent geometric leveling, performed on each of the top edges of the gasometer moving sections, and connecting 8 to 10 points fixed to the structure.
The various leveling results made it possible to calculate the relative elevation variations of the points fixed to the section structure. In turn, from the elevation variations it was possible to determine the value of the horizontal rotation of a section in its subsequent positions, the direction of the horizontal rotation axis, and, finally, the maximum slope direction.
The above is naturally valid in the probable hypothesis that the section deformations were not of such a value as to make said movements undetectable.
On the other hand, the variations of measured elevation allowed to confirm said hypothesis. In fact, if the section, although varying its position, remains rigid, the elevation variations of the various points - as drawn up on the section developed length, consist of a normal diagram of the sinusoidal type.
The two requirements mentioned, ie. determination of rotation value and check for possible deformations, made it necessary, however, a very high accu racy in measurement of the elevation variation. Major problems made measu rements difficult to think of.
First problem: when each moving section was raised from its support because of inside pressure, it was in a floating hence unstable condition so 02
as to make almost impossible to keep the bubble of conventional levels centered during the time of rod reading. E
Second problem: the inside pressure variations of the movement due to leaks and sun radiations produced movements of the cover and consequently of all elements connected to it.
Third problem, also connected with the floating condition: in order to perform the leveling it was necessary to move loads over the element which, for every position of these loads, had different situation of equilibrium.
The moving loads, that is operator, clerk and instrument, were quite small; besides they were balanced by placing equivalent weight in symmetrical position. Because of this balancing, the third problem affected measurements very slightly. The first and second problems could be overcome only by using an automatic level.
For this type of instrument the small movements due to oscillation, slow vibration, shift of the support, did not influence the proper measurement of the difference in elevation between two following points, because the instrument line of sight sets automatically horizontal. This eliminated the first problem.
The instrument faster setting up allowed to greatly reduce the time of operation and nearly eliminate the effects of the internal pressure variations. The second problem was thus overcome.
The choice felt on Salmoiraghi automatic level model 5173 (fig. 3) of new construction at that time. This instrument was chosen also for the following reasons: — reduced size and weight (71/4 x 71/2 x 13 in. 7 1/2 lbs., without case), — simplicity of operation, as the bubble is in the telescopic field and can be seen as rod readings are taken, — possibility to read .1 mm (.00033 ft.) when fitted with the micrometric rod reader device 5180. This device consists of a system moving the instrument up and down within a range of 10 mm (.033 ft.).**
The use of the normal tripod was clearly impossible. A proper bracket was therefore provided. This bracket had to be fixed tightly to the rail surrounding the top of each section and was equally spaced between the two rods. In this way it was possible to take the advantages of balanced sight leveling.
In order not to increase the number of sights, the rods had to protrude from the section edges. The solution as in fig. 4 was adopted. The supports of the pendulous rods were accurately positioned and rigidly connected to the structure of the corresponding moving section. The rods were suspended in special housings at the end of the brackets. Ten brackets and therefore sighting points, were located in the developed length of each section. The distance between level and rod varied, being in general not greater than 50 ft. At this distance it was easy to perform sighting with an error not higher than .1 mm (.00033 ft.).
The gasometer tests required a total of 28 leveling operations performed at different elevations over the different sections. The operations were performed with rapidity. Every sight required an average time of 5 minutes, which was a short time, taking into consideration the difficulties encountered by the bperating staff, moving over the edges and the loss of time caused by setting the instrument on the bracket.
Every rod reading was repeated twice. The table enclosed gives the errors of closure of the 28 levelings, divided in 13 groups. Each group includes the levelings performed on the different sections. The leveling groups Nos. 1 and 13 were performed at the beginning and at the end of the testing, when the sections were lying against the bottom, while the other groups were performed when the #* Said device is also available with English graduation. In this case the vertical movement mes .020 ft., with divisions every .0002 ft. dd
sections were supported by the inside pressure. | The errors of closure of the groups 1 and 13 were naturally smaller than those pertaining to all the other groups.
The mean square value of the error of closure in the first case (groups 1 and 13) was + .9 mm (.003 ft.), while in the second (groups 2 to 12) was +22 mm (.007 ft.).
This considerable increase of the error of closure was clearly to be attributed to the slow settling movements of the sections during the testing stages.
The leveling on the first section had errors of closure entirely positive and Justified the presence of a systematic error; for instance, a variation of the elevation during the operation due to the slow decrease of inside pressure. | Being 10 the numbers of sights for each leveling and assuming error of closure due only to the accidental errors, it resulted that the standard error in determining the difference in elevation between two following points was of + .3 mm (.001 ft.) in the first case and — .7 mm (.002 ft.) in the second case.
The values allowed to conclude that the performance of the instrument was quite satisfactory.
The relative elevation referred to the initial point A of each leveling was determined for the point of each section, through the 28 levelings. The relative elevations of the points of a section, during the intermediate testing stages, were compared. Such comparison gave the variations of relative elevation of the various points, caused by the section position changed because of the lifting. These variations of elevation were plotted in function of their position on the developed length of the circumference of each section to which the points were fixed.
Point A of each section was the reference point, and had therefore no variation. A continuous curve was interpolated between the points. The curve resulted to be very similar to a sinusoid, however, in some cases, deformations could be noticed.
In fig. No. 5 were reported, as an example, the curves of elevation variation over the 4 sections, obtained with the leveling sroup No. 5. | The position of the single points deviated very little from the interpolated | curves. Such deviations were assumed not to be caused by local deformation | of the structure but only by measuring errors. The limited dispersion of the | points confirmed consequently that the measurements had a good precision
I The position of the points of all other graphics related to other operations, | was similar to the one reported in fig. No. 5. | ' From the curves of the elevation variation the measure of the rotations of the sections during the gasometer filling stage and the position of the horizontal rotation axis was obtained. The first datum was obtained from the oscillation total excursion A of the curve of the elevation variation.
In the example of fig. No. 5 the excursion was indicated on the right side of each graphic. If D was the section diameter, the angular value WD in minutes of the rotation was calculated by the relationship: 0° = A/D. arc l’ The second datum, the direction of the horizontal rotation axis, was obtained . with small precision.
If the curve of the elevation is a perfect sinusoid, the horizontal rotation axis can be easily located over the perimeter of the section, because it cuts said peri meter in correspondence of the abscissas of the points of the sinusoid intersecting the parallel straight line to the abscissas and equidistant from the maximum and minimum points of the curve.
The deformation of the section alters however the sinusoidal form of the curve of elevation variation of each section. 54
If the above outlined method for the determination of the horizontal rotation axis is used, errors of a certain magnitude can be made. It is possible to estimate roughly the magnitude of such error by measuring the segment intercepted by the positive wave of the curve, on the straight line parallel to the abscissas and equidistant from the extremes.
For the sinusoid such length has to be equal to half ofth e entire developed length of the section.
The experimental curves give differences, with respect to the theoretical length, of about 1/8 of the entire circumference. This value, i.e. 1/8 of 360° = 459, can be taken as approximate indication of the standard error of the direction of the horizontal rotation axis of the section.
Leveling Sections Sections groups 1 2 3 4 i 2 3 4 mm mm mm mm ft ft ft ft 1 - 6° +12 00 +17 + .002 + .004 000 + .006 2 + 2,5 + .008 3 - 13 +2.5 - .004 + .008 4 0 —14 + .3 000 —.005 + .001 5 -30 +21 —32 —15 + .010 +.007 — .010 — .005 6 - 2.0 + .007 7 +24 —10 + I + .008 —.003 + .0003 8 + 3,5 + 011 9 - 40 + .5 + .001 + .002 10 +44 + .014 11 + 1.8 + .006 12 - 24 - .008 13 — 8 +11 — .3 + .3 — .003 +.004 — .001 + .001
TABLE No. 1 — ERRORS OF CLOSURE DÒ
Fio. - ‘ È E =-EERES SEI ee soit oe NES PE iui ei io ZTANTE malisano ee e Vers ene ZIE RESSE E FONTI ESE I DERE Oo ceto CLIOIS PIRO TERE SEZ ARRONE e GO CESAREA IONE eta e O a ESS SS Ea e EER SARAI IN ARI INS SEPA a = ERA MOZIONI RZ a REZZA CORAL NI INIZIALI SESIA PERNO DE RIE NOI NEAR E CN AO III RSS SIATE ea RT SERE arene IESIEREREtSCIIIRIARITZA IO SIIT ITTICA LITE E ITOA NIE ORI BS RITO Sr a on E SIA RTSIEASIEISTTZIERZO EI DIO SOS RITO OR AITIOO] SISPEIITO CAEN RESSE,
RE AS ESE es e on SE RES AI MIL e E = DE METE SIOE TIRO FISSE PECORINO DIOR LOVICTELO RR BECERA EI IA ORI ia E SA 5 LEZGSNISIZI LI LIO TORE ODINO TI CAIO CSONIOTE CONTI SOCIO RO pe NOE EBREA SII RR NAZII I RDOTTO a MAI AA AMET eee È IRE ESTE LESIORSCICS SIOE TECIRIZNOIE ZIO RE On PERO as een ES ona ee RL A O RIO EMAS ass a LCOS RISIIES II NIE NO IORSO E SERE £ 0A ESTERE RIS IE earn EMA BE DS DREI CSM prat ata SEEN DOSSIER FEOSSTOSRO a SEI DISCASE SME CSR i OSO a Sa E È È ini be «<< Ea CRISPI ELIZA a 3 Bei -— a Rn ATI te 1 4 ? La J ; x E TR bo — <<; i eos Es n c- É + COSE SRO SEL A ì Sil Siro = RD A È e = 3 a ° (fe eee i IRA n: = a 5 SESIA SE es ” LEE = SE P È =; CP Lee EE Se prese a È a « È pa 100 BUEREEE >. Ci 24 3 VISIROO RIE E Pa ì o î e eee SEL To Ae e PI ?. == 308 SAR di e FERRO. ssa EEA eTLa \ 5 ave x CRCP e PMO RL e ne Re Re ug Te RR A Ea ESA, PELLI CIRO IR ARCI, E on i a 3 c î Se SE E O RI RSS RE EEE ROS PENTITA RR Ri ? de a Bai Na O. CESSos SERE ET SORE BEDA x fg Rota rn LIIE a p ? VETRINE SO PI IRR n - : pito SCARSI DITE PSEIIREZIORO COR Rie RE Oa ZA = ARES Fei n a ì i SEA CORE o ERRO Se E = z (ese asso e FECERE vi eur Pena =3 a 5 RIE ERA e E x EN Ta È 3 \ LE SE PSR SEPPE fi È Von 36 = ei ae = È E 3 ? E RO SPONS g RETE Geo diana SI 2 si Sipario dere a oa scarse e l_ ai: ‘è SEE SS Rino e e I | ci ise3=#Gezi , be: ; CSS Nooo RETE La SIE SAI Pre ; Set n sot e È S x EE ne RAS a = ©. ari CASSESE È SR 2: Lt ne SRO 37 nose E = = orto CS SERI I e i CE ea a re I x e __} SSIS DE Sao Se e 23 NE 22% ì È x SR F SLEsRr ego CS ce î 3 PERSA ATA, a a: x 5 TSE RO RE RIZE a Sp E E SEME RA Gi e = NE IEEE NRE Vi ELIS RE = FRENI ca “< x : - LEM ERBE DECE iper e cori aree . = © RSS ASSISI AREA A i ss perno sE NIE Su NS ASSOA ARS CCR 9 CRISI RR I a e NRE SD NE d& ° Po Co MO SESSAo i: SE ASESSERO sar” CÈ > VERS o Na N a NGRISI ne SETA ca i E RSRASOZE TA AS % > NEI li SOI x PeR SEA SES creo na, DIA Eos x Ri le STESITE TINTO Pri STERN SENI VIRA ati dI SE RERTA pa e x RIS IERI Rei RAT e o E PRESE conse 3 ERE AA Cala STE x ) ERRE REI a 7 CRE = PEER CO NM IRTIERE Lr 4 x : = 7 NARA Re pr e: iron 2 SES RT otiagg A = = î ESTR Sa RIME MENO e e — SA TR RR tn dre a >: È PNE O II i SERRE e E ASIA A SES NE DRG a > 2 x NN E RA a ERSCA ros FER A e + RSS, SIR ERE) CINI: x x CI RI < SP RR: SERA LF RE E - È & x NÈ RIO ar RI ic E I E OReeI RETE Cena an T= & x = pi Erre SRO EI ICARO scs dara PPTSSERNTE TA x A 7 ELSA RE Ce I ME ae BRNO SETA . = . = " % io Ss € cat td BE SIE o E A Roana 2275 halls Cus ca ce ae x G DO 7 * a Te SSR A e RT EE RE E ARRE I DOTUOIAA EROI SERE A TTTII SUE Ds x\NeÉ - & = RENEE ini Rev 2 SCORES AS SDA 6 , DE Ge Mar Sata AI be Gi SA} i f p_-3 ETERO E RUE, SS era ca a nino; 5 lata “È Peppe peo diri ora RI RE a anni TRE ee o CE dechetss => sodi È AOL cho a mn RE + PERSE Sa pier 4 EST = = de 4 i IRA nti a s = lim ra — a e e e ap È ra def > n Tee E. La UE one dre È ox raga -—- — ci PSR tf 5 s9 3 TARRA ER IRA a fa SPA DRS SPREA ii 2 i e E< AIEÉLESARIASIISSLE SE fre RA î RR e, = CARASSO ACI pare "i EI PrO dl È si A | <3X LIRA NE CER CESSARE, SIE AES ESS ESAME 3 (RREe e È E n, Sana Ta MOLTI CARI e SE ORSO POSE ESE I STA Ripe fi cf È n x ì e >. ERI CRT, dc SAAS RIA SO FI. a nanne: 3 SSTT=: SMI ANTI MIRI AOSTA OE 4 CRE pan e be =; ol po Ro AT se, EEE fa ES EEA ei. f / a asa 5 Cd AAA IO ARSA ED SAI SS i SS AA TE 2 È ai USA” CAR AEE 3 CSC SS ROSS i * | H FRE gong te AE ALA ESe fe RE: SEE A 3 e Pen - = - " pc dg” SEI RES BERE EI TRE ERRO at 9 Se ° 4 n fee e fr PIER . - A Me €ÈR65EARTA FASE E FESSREARTOS ZA DI ai A CSA ri < = RE Ego È È il AA 3 F Corre fee EE È ng SA e CE a eee — << i ero PS ” : pi ° ae er e e rr ri 3 ene art aa a fi 3 asce bp ASSO fe FESSO PE SD SEGA 3 rg a È of 5 3 y : } È f f ESTFAIIA,A Li SE fo ASSE REESE E È RESSE î ta Ered # Pif ( TSI AA TERI SEI ESA SESIA di ricci A ag A fa Ri i 4 E EE PILE È et ra frà } $ È ESS t 3 i ASSET o È eric MERI Pi 9 30 Liceo ; di enni E Piro Bitti PR ih un 3 REI; fai. da i - 5 o E pe te SES È & È i seg | i SG Si: 3 3 = iii; | i E. i. ine e ne je 3888 2 - RR ga È È € 37 Sar E SEA E El SIE _—Pyt_— 3 È ; na LE s o + OLA She : i i i i : i * sE Piro Re = da serre 3 2) È er > | ea 2 E; ui | ECTS + AREE : = î È S : REC ASNG aa ca SE 3 a - x a PRESSI TN ge O IO I ERGO RE RE CERERE icon E ARONA ro e n rente). ner Sas ie co ee SR ie CR ee ee nisi E ate e = => = = E EE REEZIE SOS ng SLA SEE So LIL FRE Sa e io so CE ctr RIE TRES ESSERE e SE CRE EEE ca CC EI ere EI e e le. So beast one Sc ERETTE: EEC n ZZZ PE RO. SL è ST IZ ESTRO SEE SIAE IR Sn E ER SE RO CREO RSS cc na E a POT ie e e I pt A net Latium rit ste e DEI e SESSOREE, SIETE ISIS RESA: SERENE I EE E RO SOREORO dea I cai = eetis #° Sa RI figa pier o se IT Bee RR I ESTA SOA RS a REA RR TI elena sal = e Der ER E a “ ———""—-=-= °° eci ce ETRE pe FC LIES TI ERE ESA SS cas TL Fre RITI e prio i SISI RIO I e te e — °° ara de ì. = AMBER FRE SE | EAST I ESS o 4 FEES TERZÀI ae EZIO TIT, la EL e = Dire ne oo i estesi i esa e 33 7 Ea = ae SOR a be.» MM > e TIE a Peres EE: È S Sn COTTE = S rai e a Crollo SEDE: E TITLE RE ecs arsenale. ni i oe cRaeS > e Crea cp DI Sa PREIS, PR DEAR DE A ERRE I E E Ro Sona Esa na e Lidl _r_o- sb SS SEA SEO IE So SRI TE Sa ese -& ESTESE ie — et cia rea 2 SEE SS ea SIL È > = i SERE oa ae “O Rat STA pre sen aa = Boacc= eno ea LE E SEITE e A ESS) RE sesso — # SIE rc SE ri SE e SSR ST EE = i O Redte 2 E LI == SESSO Pre i See 3 Poor e = sas"? : in s elet = E Ag a CRSIECTA a n iii sa aa CAR oe e sar 7 > Se, È er Fi 5 ir << ÉE ESSER | È SE E, $ Si LS Di £ È CI o 19 d a e % n A 3A = aero 2 È S e —# 3 E # ia = î È sis é È e 55 Ga È SI c a Si = È o SMS pt : c= SCE " Ù | seri | Pr il A. | ASL |
na = 77 Lod ® x Fig. 2 GASOMETER AT 50% CAPACITY Pa ara na —- —= A ARIA rane Ò 2 s i = a z parconta: x a E ERRE IS RE : frcarata TREE PRIORE SETT pae Ti aree ot 5° Fia n RE î * Zi 5 _ aa 2 erre nea % n 3 re a EL x ° È RESI ERETTI aggio \RRRANSI x re pae CERTO Na sé - x i EIA : pers cscene ico 32 PIE E” % = SASA AS: ire — - , a 3 a cs RE 3 SES ea pr APRIBILE ZITO E ON CO CRA RO E CO . I pane ERI pre OE NE 0) SE CAP REI MOSSE I OSIO ANSA RI PN VERS e SEG È perse se SEIFGOTI AE SSR TE NRE CA A DO RT roca RR ETA o € ISEE SSR RSS A ge e CISL A alt ag ageoaie COcLa IO ioNe cli ce CÒ È POOESIREE a 2 EER REI RARO E COINS ene SOR o e a RS ì Fi È SERE È See ES Re I RS SRO RE NARA N) SR Ra È FEETEO DILIANO SERE EI SSR DIRO RR SO gn o sv FE EsSESRO RE Care EEE ZEEIEIO ALAN i, "On [Gase e - EE IT SES RIO EN RI II AN ER e ISO ESSHEEDE ASIA EEA SC ER SES ZO) SEO RIN IRE OO IR Sa CE GREENE EE a SE 7 o AI SA CSI TE SI RO VORO SEO AREA REC IO I ILINOREIOIIO, O E NOI DIR) NE CT I gi EN tr A RS COR i = ESERRSSO VELINE TS Sa i SRO RE AO SC CILESISIGOLE Ni i DC OREROA us RR I ce IGO CRE E i 5 è ESEsraeeo n RS PROSE NA ESD Re SEE RITI IE CDI RU rio NEBBNEN. MIE AaRAA CE Vaiagioe RSS REI 7 3 pone nia © CAETANO RSS SA Se Li: e Fresa Pi PES SERIO CEE ROL LO DIA ORE RR EE RE . SIOE SS IRE SARTRE 3: PRESEN EE RE I ORA CS III RZ AMINA RIA RE GER, Delbatnicis se 35 CREO RO ROS E SI AGE IONE IBRA MERI Aa Meta ESCE S SEO E E 1 TOTO È RENEE N RE II MIN RI Ae o) MEI ORE pan DARIO RA RAC Ro a di È È 2 E f È ; I FERRE I RC essa SENTORE COAST LIONE N BILI VOIR CS SA i apae SOI (RT SETTE RENOIR TRE RE CROMO nn È Qlcronze Ù re